Bahcesehir Housing Compound Water Supply Project (WSP)
Date of Contract: December, 2001 Handover Date: March, 2002 Contract Value: 250.000. -USD
Employer:
Mesa Housing & Construction - Istanbul / TURKEY
Nature of the Work
The 2nd phase of Bahcesehir Residential Area project consists of 763 houses and apartments. The project completed by Piomak covers two water depots; one pumping station and the network to supply 260 m³/h. The water fed from the main pipeline is pumped to the collecting lines with four 90 KW high lift pumps. Piomak is also completed the electrical installation of the system as well as the necessary MCC panels for the pumping stations.