Gaziantep City Water Supply & Distribution SCADA System, Operation & Maintenance
Date of Contract: March, 2008 Handover Date: July, 2010 Contract Value: 5.426.850. -USD
Employer:
Gaziantep Water & Sewerage Authority (GASKI) - TURKEY
Nature of the Work
Piomak was a member of the joint venture that was awarded the contract for this project. Four kinds of works within the scope of the project were performed: civil, mechanical, communication, and SCADA works and operation, and maintenance of the system for 2 years.
The main objectives for the SCADA system that was implemented were the central monitoring of the whole city network system of potable water; reducing power consumption; optimizing the operational staff level using a fully automated mechanism; providing a water leakage that will enable reduction of losses; preventing flooding of storage reservoirs; storing data concerning the behavior of the water system; and achieving full compliance with mandatory reporting requirements for any regulatory agency.
GASKI is serving 430.000 subscribers with a total supply amount is 250.000 m³ per day. Piomak successfully installed 115 remote terminals units, 241 motor actuated valves, 145 flow transmitters, 212 pressure transmitters, 82 energy analyzers, 40 pressure reducing valves, and 12 water quality transmitters.