Saruhanlı (Manisa) Turnkey Wastewater Treatment Plant (WWTP)
Date of Contract: January, 2012 Handover Date: December, 2013 Contract Value: 4.130.000. -USD
Employer:
Provisional Development Bank of Turkey, İller Bankasi - Turkey
Nature of the Work
The installed WWTP was foreseen to serve the city Saruhanlı, nearby Manisa with a total population of 77.000. Piomak build up the complete plant which is combined of Influent, Primary Clarifier, Biological Treatment and Effluent parts.
Piomak had constructed the civil works needed for each WWTP unit, as well as installed and commissioned all Electromechanical sub-systems, Electric Control and Power Supply backed by field instrumentation and Process Automation System.
The total system is monitored and controlled by a Supervisory Control and Date Acquisition (SCADA) Computer Monitoring Station with more than 1250 Input/ Output control process signals.