Sewerage Pump Stations Automation & SCADA Project
Date of Contract: February, 2003 Handover Date: December, 2004 Contract Value: 719.000.-USD
Employer:
Khartoum for Water & Services Authority – Sudan
Nature of the Work
The sewerage water from the 16 storage tanks in each station is pumped to the main collector line. A total of 21 pumps are utilized in these stations.
Piomak renewed the electrical drives and control panels of each pump, added the necessary level and flow instruments for control of each station, and included one Remote Terminal Unit (RTU) electronic control panel to collect more than 480 input/ output control signals to send via a radio frequency communication system to the Main RTU unit in the Supervisory Control and Data Acquisition (SCADA) control center
The integrated SCADA control system, collecting the necessary information from the RTUs with max 30 km distance, is monitoring and remotely controlling the 16 stations. In the SCADA control room, all alarm and events are reported, pumps are operated for equal periods and turn to standby automatically.