Turnkey Wastewater Treatment Plant (WWTP)
Date of Contract: May, 2003 Handover Date: March, 2005 Contract Value: 4.957.000.-USD
Employer:
Water and Sewerage Works, Kavaja City - Albania
Nature of the Work
The installed WWTP was built to serve Kavaja with a total of 1008 m³/h wastewater. Piomak was a member of the joint venture that provided a complete electrical system, all the field instrumentation, and an automation system to control more than 500 input/output control signals.
The most important feature of the plant is that the arriation unit is made of “Trickling Filter” which is more efficient process with reduced electricity consumption.
The total system is monitored and controlled by a Supervisory Control and Data Acquisition Computer Monitoring Station (SCADA) installed in the control room.