Turnkey Yeşilhisar (Kayseri) Waste Water Treatment Plant (WWTP)
Date of Contract: January, 2012 Handover Date: September, 2012 Contract Value: 2.978.000.-USD
Employer:
Provisional Development Bank of Turkey - İller Bankasi
Nature of the Work
The installed WWTP was intended to serve the city of Yeşilhisar, nearby Kayseri, with a total population of 25.000.
Piomak built the complete plant to combined Influent, Primary Clarifier, Biological Treatment and Effluent water processing units.
Within the scope of the Turn Key contract, all civil works needed for each WWTP unit were completed, all electromechanical subsystems were installed and commissioned, and the electrical control and power supply were backed by field instrumentation and a Process Automation System. The total system is monitored and controlled by a Supervisory Control and Data Acquisition (SCADA) Computer Monitoring Station process with more than 480 input/output control process signals.