ULUOVA Construction and Machinery Industry
Date of Contract: December, 2010 Handover Date: December, 2015 Contract Value: 2.250.000, -USD
Employer:
Manyas II Phase Irrigation Project; Ergili Pump Stations Electromechanical Works - Turkey
Nature of the Work
The Turn Key project piomak was awarded had all the electromechanical works needed for Pump Station 1 and 2, which had included:
• 4 x horizontal pumps 640 l/s for pump station P1,
• 4 x horizontal pumps 560 l/s for pump station P2,
• Ø 1200, 1500 m pressurized steel pipeline,
• Automatic Backwash Filter System,
• Instrumentation, manometers and flowmeters,
• All electrical cabinets and cabling for pump station, and
• Automation and Control System including PLC panels.